CASE STUDIES


Leeds City Centre
Urban Design Strategy


Click here to enlarge

Click here to enlarge Guardrail
___________________________________
(street furniture)
Decorative design in Retail Quarter takes
advantage of the design opportunity,
unlike the standard galvanised steel
version over the Inner Ring Road
(in some cases omission of guardrail will
be an even better urban design solution)

The case studies presented
here express some of the
urban design principles
established in CCUDS.

The range of examples is chosen
to show the varied scale of
intervention into the existing
cityscape - from guardrail
design to building extensions
and larger site development

Click here to enlarge

Click here to enlarge East Parade
___________________

(active frontage)
Sensitive and modern
approach to insertion of
café use at ground floor
of 1960s office building
on East Parade

Click here to enlarge

Albion Street
_______________________________
(plinth building)

Improved street enclosure by adding
a floor to a diminutive plinth building
Click here to enlarge
Leonardo extension
_________________
(corner)

Positive corner/
urban infill
 

_________________
Detail of urban design analysis map -
Study Area 1

Millennium Square
____________________
(former surface car park)

Design for a space for
relaxation and activity

CASE STUDIES

Leeds City Centre
Urban Design Strategy


CASE STUDIES

Leeds City Centre
Urban Design Strategy

 

 

 

 

 

_______________________
Detail of urban design
analysis map - Study Area 8
Click here to enlarge Click here to enlarge Click here to enlarge Click here to enlarge Click here to enlarge
Click here to enlarge Sweet Street
_______________________
(gateway opportunity)

Planning and Development Brief
for the site illustrates the need
for - key gateway image, quality
tall building, restoring urban
grain at edge of Holbeck
Click here to enlarge Click here to enlarge Click here to enlarge Click here to enlarge
Click here to enlarge

Click here to enlarge

Templar Street
___________________________________________
(former bus station / surface car park)
Indicative ideas improving Vicar Lane streetscene,
creating gateway image to Inner Ring Road, public
square, re-use of appropriate existing buildings


_______________________
Detail of urban design
analysis map - Study Area 2

Riverside
____________________________________________
(under-developed / surface car park)

Repair of urban grain, removal of large sprawling
development, improvement of pedestrian connections,
lively and accessible riverside with mixed land use, new
link bridge to open up landlocked site (and Holbeck)

Click here to enlarge
Click here to enlarge
______________________

Detail of urban design
analysis map - Study Area 3
Click here to enlarge
Click here to enlarge
Southern/Motorways
____________________________________________
Larger area plans/strategies may be forthcoming
following further public participation
(eg. idea
proposed at CCUDS 'Designing the City' workshop to
provide a landscape buffer to the motorways in the
south, with park and ride and motorway-related land
uses between. Increased residential and key
cultural/civic uses to increase activity and
pedestrian movement in the area south of the river)
 

CASE STUDIES

Leeds City Centre
Urban Design Strategy